Presentations
Presentations - 2026
Market Monitoring Plan presentations may be viewed and printed through the use of the Adobe Acrobat Reader. They are organized by year, meeting and meeting date.
2026 | 2025 | 2024 | 2023 | 2022 | 2021 | 2020 | 2019 | 2018 | 2017 | 2016 | 2015 | 2014 | 2013 | 2012 | 2011 | 2010 | 2009 | 2008 | 2007 | 2006 | 2005 | 2004 | 2003 | 2002 | 2001
| Meeting | Meeting Date | |||
| IMM Curtailable Load Proposal (PDF) | CIFP: Reliability Backstop Procurement / Connect & Manage | 06.30.2026 | ||
| IMM Reliability Backstop Auction Design Proposal (PDF) | CIFP: Reliability Backstop Procurement / Connect & Manage | 06.30.2026 | ||
| Market Monitor Report (PDF) | MC | 06.24.2026 | ||
| IMM Connect and Manage Design Proposal (PDF) | CIFP: Reliability Backstop Procurement / Connect & Manage | 06.10.2026 | ||
| IMM Backstop Auction Design Proposal (PDF) | CIFP: Reliability Backstop Procurement / Connect & Manage | 06.10.2026 | ||
| IMM RCSTF Perspective (PDF) | RCSTF | 06.04.2026 | ||
| IMM Reserve Performance Proposal (PDF) | RCSTF | 05.21.2026 | ||
| IMM Reliability Backstop Auction Design Proposal – V4 (PDF) | CIFP: Reliability Backstop Procurement | 05.08.2026 | ||
| Reserve Requirements IMM Proposal (PDF) | RCSTF | 05.01.2026 | ||
| RCSTF Issues Overview (PDF) | RCSTF | 05.01.2026 | ||
| IMM Reliability Backstop Auction Design Proposal (PDF) | CIFP: Reliability Backstop Procurement | 04.27.2026 | ||
| 2025 Annual State of the Market Report for PJM (PDF) | Special MC: 2025 State of the Market Report for PJM | 04.24.2026 | ||
| Market Monitor Report (PDF) | MC | 04.22.2026 | ||
| IMM Comments on Proposed DR Penalties (PDF) | MRC | 04.22.2026 | ||
| March 1, 2026 Synchronized Reserve Performance Inquiry Results (PDF) | OC | 04.09.2026 | ||
| Annual Black Start Revenue Requirement (PDF) | MIC Special Session: Annual Black Start Revenue Education | 04.09.2026 | ||
| Regulation Market Observations (PDF) | MIC | 04.08.2026 | ||
| Winter Storm Fern (PDF) | MIC | 04.08.2026 | ||
| Market Monitor Report (PDF) | MC | 03.25.2026 | ||
| PJM vs IMM Performance Metric Example (PDF) | MIC | 03.11.2026 | ||
| Fuel Cost Policies Education (PDF) | MIC | 03.11.2026 | ||
| DR Penalties Matrix Additions (PDF) | MIC | 03.11.2026 | ||
| Reliability Backstop Auction Design Proposal –V2 (PDF) | Reliability Backstop Procurement Workshop | 02.25.2026 | ||
| Market Monitor Report (PDF) | MC | 02.19.2026 | ||
| IMM Backstop Auction Design Proposal (PDF) | Reliability Backstop Procurement Workshop | 02.17.2026 | ||
| DR Nonperformance Penalty and Performance Adjustment Factor Example (PDF) | MIC | 02.04.2026 | ||
| Flexible Resources Energy LOC (PDF) | MIC | 02.04.2026 | ||
| Advanced Scheduling Design Options (PDF) | MIC | 02.04.2026 | ||
| Locational Reserves (PDF) | RCSTF | 01.28.2026 | ||
| IMM Position on Operating Reserve Demand Curves (PDF) | RCSTF | 01.28.2026 | ||
| Supply Uncertainty (PDF) | RCSTF | 01.28.2026 | ||
| Market Monitor Report (PDF) | MC | 01.22.2026 | ||
| DR Nonperformance Penalties (PDF) | MIC | 01.20.2026 | ||
| RMR Matrix Issues: Scope Areas 4, 5 and 6 (PDF) | DESTF | 01.12.2026 | ||
| November 11, 2025 Synchronized Reserve (PDF) | OC | 01.08.2026 | ||
| Fuel Cost Policy Periodic Review (PDF) | MIC | 01.07.2026 |